NEWS ROOM  
 

:: Company News

 
     
  ARCHIVE  
  :: 2003  
     
     
     
     
     
     
     
     
     
     
 

COMPANY NEWS

 
     
 

BJ Tubular services completes expandable casing running operations in Middle East and Asia

Posted: 24 May 2004

BJ Tubular Services announced the successful completion of several expandable casing-running operations for Enventure Global Technology's Solid Expandable Tubular (SET) Systems on behalf of several major operators in the Middle East and Asia.

BJ Carries Out Expandable Casing Running Operations in Saudi Arabia & India
A contract from a major operator in Saudi Arabia required BJ to supply torquing and handling equipment to run Saudi Arabia’s first expandable casing installation in ANDR-497, a horizontal reservoir producing well located in the eastern province of Saudi Arabia. Working from rig 153, BJ ran a 736-ft length of Enventure’s solid expandable liner system into the well. The 5-1/2-inch system was then expanded by Enventure into the 7-inch base casing, effectively isolating the Arab-D gas cap.

Given the success of the operation, this Saudi Arabia operator has awarded an additional contract to BJ to supply torquing and handling equipment to carry out further expandable casing make-up operations on five of its slim wells in Saudi Arabia. As with the first operation in Ain Dar, BJ will utilise dedicated personnel and a specialist suite of equipment developed specifically for the make-up of expandable tubulars. This equipment is maintained in Dammam at the BJ Tubular Services base of operations.

BJ has also provided expandable casing make-up services in India’s first SET operation in India, which was carried out for Enventure on behalf of a major operator. The expandable tubular systems were successfully made up by BJ for two wells from the SP Platform located in the Mumbai High South Field offshore India.

Business in Indonesia Continues to Thrive

In 2003, BJ Tubular Services successfully made up and ran solid expandable tubulars to desired depth on behalf of a major operator in Indonesia. Expansion services were then carried out by Enventure on wells Gehem #1 and Gehem #2 in Balikpapan, Indonesia. BJ provided the services to make up and run in 1,861-ft. 7-5/8” x 9-5/8”, 948-ft. 9-5/8” x 11-3/4, and 2,760-ft. 13-3/8 x 16” SET systems, respectively, which were expanded against 9-5/8”, 11-3/4” and 16” base casings. Further projects for this operator scheduled to commence later this year are currently in the planning stages.

“By using BJ Tubular Services’ specialist non-marking solid expandable tubular handling system to ensure that the tubulars weren’t damaged during make-up, we contributed to the success of these operations in India, Saudi Arabia and Indonesia,” Neil Gordon, general manager of BJ Tubular Services. “Overall, we are pleased with these outcomes, and look forward to utilising this very effective handling system again on behalf of operators around the world,” he added.

BJ Tubular Services specialises in personnel and equipment for running casing and tubing, particularly premium connections, high chrome content tubulars, dual, triple and sub-sea completions, as well as hammer conductor-driving services.

The tubular division is known throughout the world for its innovative technology.

BJ Services Company is a leading provider of pressure pumping and related oilfield services to the petroleum industry. The company operates in every oil and gas-producing region.

For more information see www.bjservices.co.uk

Posted by Richard Price, Editor Pipeline Magazine

Information supplied by companies or PR agencies who are responsible for content. Send press releases to info@pipelinedubai.com

 
     

 

© Copyright 2002. Reflex Publishing ME FZ LLC. All rights reserved.
Pipeline Magazine, PO Box 53777, Dubai Media City, Dubai, UAE
Tel: +971 4 3910 830 | Fax: +971 4 390 4570 | E-mail - info@pipelinedubai.com