NEWS ROOM  
 

:: Company News

 
     
  ARCHIVE  
  :: 2003  
     
     
     
     
     
     
     
     
     
     
 

COMPANY NEWS

 
     
 

3CMetal opens new facility in Dubai Investment Park

Posted: 03 June 2004

3CMetal has been operating a steel fabrication workshop in Pau (France) since 1995 and has recently opened a second facility at Dubai Investment Park (Green Community), at 2 km from JAFZ.

The company specialises in general oilfield and marine steel fabrication work with an emphasis on high pressure piping.

The business is centred around two main activities:

  • Workshop steel fabrication work
  • Site installation and maintenance work

Facilities
The facilities consist of a covered workshop of 2,000 m² with two 10 T. overhead cranes (20 T. lifting capacity) and one 5 T. overhead crane. The workshop is subdivided into a general fabrication section of 1,200 m² and a piping fabrication section of 600 m².

The company has 600 m² of offices, including a design and engineering section on Inventor Professional (Autocad 3D modelling software).

The facilities are located on an open road-based yard of 18,000 m² with ample space to accommodate two complete landrigs adequate for rig-up, refurbishment and commissioning work.

The workshop is equipped with all necessary machinery to undertake any kind of oilfield steel fabrication i.e. shearing, bending, rolling, drilling, welding, bandsaw, pressure testing machines and post weld heat treatment equipment with chart recorder for the high pressure piping. 3CMetal holds a substantial stock of high pressure piping, grade X52 and 4130, ranging from 2” to 5” XXS and a large quantity of high pressure valves and fittings (including hammer unions).

3CMetal is in the process of being API Q1/ISO-9001 certified.

The management team includes:
Frans Plaggenburg - General Manager,
Yannick Damry - Operations Manager and
Philippe Huyghe - Workshop Foreman

The company is dedicated to pursuing quality, efficiency and adequate safety management, with a qualified and motivated multinational workforce of Romanian, Malaysian and Indian welders and fitters.

Site installation work
3CMetal International has a dedicated team of about 40 European welders and fitters who are exclusively assigned to site modification, installation and repair work on land and offshore rigs, ships and production facilities.

Technically supported from offices in France and Dubai, the company can undertake overseas and local assignments for site steel fabrication work.

Recent 3CMetal projects include:

  • Lumpsum replacement of a BMC-900 offshore crane on drilling rig Dhabi-II by a BMC-1200 in Abu-Dhabi, including Class approvals.
  • Design, engineering, supply and installation of a mud tank system for Total ABK in Abu-Dhabi.
  • Supply, install and test high pressure and CuproNickel seawater piping on the Kizomba-A platform in Rotterdam.
  • Design, engineering, supply, installation and certification of overboard testing lines on drilling rig Rani Woro in Jebel-Ali.
  • Design, engineering, fabrication and installation of temporary wellhead platforms on Sth.Pars jackets for Statoil, offshore Iran.
  • Fabrication and installation of a fast moving landrig pony substructure for NWD in Libya.
  • Repair to a high pressure standpipe manifold for Pride International in Siberia.
  • Supply, prefabrication and installation of all high pressure piping on DPDS Pride Africa and Pride Angola in Korea.
  • Prefabrication and installation of all hydraulic and high pressure piping on DP semi-submersibles Sedco Express and Sedco Energy in France.

For more information see www.3cmetal.com

Posted by Richard Price, Editor Pipeline Magazine

Information supplied by companies or PR agencies who are responsible for content. Send press releases to info@pipelinedubai.com

 
     

 

© Copyright 2002. Reflex Publishing ME FZ LLC. All rights reserved.
Pipeline Magazine, PO Box 53777, Dubai Media City, Dubai, UAE
Tel: +971 4 3910 830 | Fax: +971 4 390 4570 | E-mail - info@pipelinedubai.com