NEWS ROOM  
 

:: Oil & Gas News
:: Company News

 
     
     
     
     
     
     
     
     
     
     
     
     
     
 

COMPANY NEWS

 
     
 

Marathon first production from Braemar field

Posted: 1 October 2003

Marathon Oil Corporation, through its wholly owned subsidiary Marathon Oil UK, Ltd, announced it has commenced production of gas and condensate from the Marathon-operated Braemar Field.

Production is flowing at a gross daily rate of approximately 50 million cubic feet of gas (mmcf) and 4,500 barrels of condensate.

The Braemar Field is a gas and condensate reservoir discovered in 1985 and located in UK Continental Shelf Block 16/3c in the Central North Sea some 315 kilometers (196 miles) northeast of Aberdeen in a water depth of approximately 125 meters (410 feet).

The field has been developed with a single subsea well tied back to the Marathon-operated East Brae platform 12 kilometers (7.5 miles) to the south where the liquids and gas are processed. Braemar condensate production is then delivered from East Brae to the Forties pipeline system.

Braemar gas is contracted to the Miller Group and flows into the Brae gas processing and transportation complex.

Gas will be delivered to the Miller Group through the new 9-kilometer (5.5 mile), 16- inch Brae-Miller Link Line connecting the Brae B platform to the BP-operated Miller platform.

The Link Line is scheduled for completion in the fourth quarter of this year.

Commenting on the new production, Les Thomas, President of Marathon Oil UK, Ltd, the operator of Braemar, said, "Braemar has been a successful satellite development only made possible by the use of existing infrastructure. It enhances the value of the Brae area infrastructure and the Brae-Miller Link Line provides a connection between the SAGE and Miller gas systems which provides flexibility for the future."

The Braemar field holds estimated total resources of approximately 116 billion cubic feet (bcf) of gas and 10 million barrels of liquids. Marathon is operator of Braemar and holds a 26 per cent interest in the development.

The remaining interests are held by BP Exploration Operating Company Limited and Arco British Limited (52 per cent), Talisman Energy (UK) Limited (10 per cent), Kerr-McGee Oil (UK) PLC (5 per cent), Nippon Oil Exploration and Production UK Limited (4 per cent), and Lundin North Sea Limited (3 per cent).

Partners in the Brae-Miller Link Line are: BP Exploration Operating Company Limited and BP Exploration (Alpha) Limited (40.5 per cent), which serves as operator, Marathon Oil UK, Ltd. (19.3 per cent), ConocoPhillips (UK) Limited (15 per cent), Saxon Oil Miller Limited (9 per cent), Talisman Energy (UK) Limited (7 per cent), Kerr-McGee Oil (UK) PLC (4 per cent), Nippon Oil Exploration and Production UK Limited (3.2 per cent), and Lundin North Sea Limited (2 per cent).

Marathon is a fully integrated energy company engaged in the worldwide exploration, production and transportation of crude oil and natural gas. The company refines, markets and transports petroleum products in the United States through its 62 per cent ownership interest in Marathon Ashland Petroleum LLC. For more information about Marathon, visit the company's web site at www.marathon.com .

For more information see http://www.marathon.com.

Posted by Richard Price, Editor Pipeline Magazine

Information supplied by companies or PR agencies who are responsible for content. Send press releases to info@pipelinedubai.com

 
     

© Copyright 2002. Reflex Publishing and Print. All rights reserved.
Pipeline Magazine, PO Box 53777, Dubai Media City, Dubai, UAE
Tel: +971 4 3910 830 | Fax: +971 4 390 4570 | E-mail - info@pipelinedubai.com